westport, ct building permit applicationpurity vodka calories
Our Permitting Assistant is available to talk you through the process of entering permit applications until you become comfortable with the new system. Opposes supportive housing plan. Zoning Location Survey for 10 & 12 Maple Ave N prepared by Landtech, 11-16-22 #PZ-22-00806 Built in 1957, the one-story ranch has 1,744 square feet, is situated on a 1.64-acre property, and changed ownership in July 2020 for $780,000. Applicants Materials 02-14-23, *WITHDRAWN ITEMS & RECENT ACTED UPON ITEMS Will Appear Until the Appeal Period Ends*, GRANTED 2/27/23 -1595 Post Road East - Special Permit/Site Plan Appl. View All /QuickLinks.aspx. Field Card @font-face {font-family:"Cambria Math"; panose-1:2 4 5 3 5 4 6 3 2 4; mso-font-charset:0; mso-generic-font-family:roman; mso-font-pitch:variable; mso-font-signature:-536870145 1107305727 0 0 415 0;}@font-face {font-family:Calibri; panose-1:2 15 5 2 2 2 4 3 2 4; mso-font-charset:0; mso-generic-font-family:swiss; mso-font-pitch:variable; mso-font-signature:-536859905 -1073732485 9 0 511 0;}p.MsoNormal, li.MsoNormal, div.MsoNormal {mso-style-unhide:no; mso-style-qformat:yes; mso-style-parent:""; margin-top:0in; margin-right:0in; margin-bottom:10.0pt; margin-left:8.65pt; line-height:115%; mso-pagination:widow-orphan; font-size:12.0pt; font-family:"Calibri",sans-serif; mso-ascii-font-family:Calibri; mso-ascii-theme-font:minor-latin; mso-fareast-font-family:"Times New Roman"; mso-hansi-font-family:Calibri; mso-hansi-theme-font:minor-latin; mso-bidi-font-family:"Times New Roman";}.MsoChpDefault {mso-style-type:export-only; mso-default-props:yes; font-size:11.0pt; mso-ansi-font-size:11.0pt; mso-bidi-font-size:11.0pt; font-family:"Calibri",sans-serif; mso-ascii-font-family:Calibri; mso-ascii-theme-font:minor-latin; mso-fareast-font-family:Calibri; mso-fareast-theme-font:minor-latin; mso-hansi-font-family:Calibri; mso-hansi-theme-font:minor-latin; mso-bidi-font-family:Arial; mso-bidi-theme-font:minor-bidi;}.MsoPapDefault {mso-style-type:export-only; margin-bottom:8.0pt; line-height:107%;}div.WordSection1 {page:WordSection1;}, Fees: Tiered, ranging from $500 to $4,000, Fees:$4,000; (Class I mods are $470 w/o approval and $970 w/ approval); Annual Fees = $2690, Public Notice:30-day initial notice of application- AND -Notice of Tentative Determination (30 days), Fees: Variable base on withdrawal amount. WFM Comments 1-5-23 Certificate of Mailing Stay safe and enjoy the summer. Public Notice: Initial Notice of application - AND - Notice of Tentative Determination (45 days). Senior Environmental Permitting & Compliance Engineer,Scientist or Department Comments We are here to accommodate and move commercial and residential projects along as quickly as possible. Authorization Letter. $100, $300, or $700 depending on Statutory applicability. Forms, Permits & Licenses | Greenwich, CT Comments from Aspetuck Health District, 2-27-23 For more information or to schedule a Zoom meeting, call our office at203-341-5025. Remainder due varies based on wastewater category and volume discharged. Variable based on acreage. %PDF-1.6 % #PZ-23-00041 Telephone: 203-341-5025 This may sound like a lot of paperwork, and it is. Fees: 4/40 docks/access stairs: $700. Category: Teardowns - Westportnow.com Permit Fees Requirements for a New House Application/Permit Yard Sale Permits Zoning Map (2015) Cemetery Department Cemetery Fees Cemetery Regulations Research Public and Private Cemeteries Westport Cemetery Gravestone Cleaning, Repairs and Restoration Conservation Commission Beach Ave Plan Conservation Commission Fees Forms & Applications E-mail: buildingpermits@westportct.gov. Accela Citizen Access Comparison Exhibit, Revised 02-28-23 BuIlding Department | Westbrook, CT A building official oversees building applications, zoning applications, local ordinances. Department of Energy & Environmental Protection, Recreational & Natural Resources Licenses, Minor Modification Application for an Existing New Source Review Permit, Revision Application for an Existing New Source Review Permit, Auto Body, Boilers, Combined Heat & Power, Distributed Generators, Emergency Engines, Rock Crushers, Solvent Degreasing, Surface Coating, Limit Potential to Emit - limitations on premises-wide actual emissions below a Title V source, Minor Modification Application for an Existing Title V Permit, New Title V Permit or Renewal of Existing Title V Permit, Non-Minor Application for an Existing Title V Permit, Revision Application for a Title V or Title IV Permit, Radioactive Materials and Industrial X-Ray Device Program, Addition of Grass Clippings at Registered Leaf Composting Facilities, Leaf Composting Facility Registration Packet, Sheet Leaf Composting Notification Packet, Disposal of Special Waste (Including Asbestos), Facilities which Treat, Store or Dispose of their Own RCRA Hazardous Waste, Waste Transportation (including Spill Cleanup Contractor License), Collection and Storage of Post-Consumer Paint, One Day Collection of Certain Wastes and Household Hazardous Waste, Re-Introduction of Pesticides into State Waters, Beneficial Use Determination (BUD) Approval, Storage & Processing of Asphalt Roofing Shingle Waste (ARSW) for Beneficial Use and Recycling, Storage and Processing of Scrap Tires for Recycling and Beneficial Use, Contaminated Soil and/or Sediment Management (Staging and Transfer), Connecticut Solid Waste Demonstration Project, Construct and Operate a Commercial Facility for the Management of Recyclable Materials and Certain Solid Wastes, Construction and Operation of a Solid Waste Facility, Disruption of a Solid Waste Disposal Area, Renewal Application of Construction and Operation of a Solid Waste Facility, Stormwater and Dewatering Wastewaters from Construction Activities, Stormwater Associated with Commercial Activities, Stormwater Associated with Industrial Activities, Stormwater from Department of Transportation Separate Storm Sewer Systems, Stormwater from Small Municipal Separate Storm Sewer Systems, Emergency or Termporary Discharge Authorization, Comprehensive Discharges to Surface and Groundwater, Domestic Sewage Treatment Works (For municipal and private sewage treatment facilities discharging to surface waters), Manufacturing, Commercial, and Other Activities; surface, ground and sewer discharges, Point Source Discharges to Waters of the State from the Application of Pesticides, Exemption from Regulation in an Aquifer Protection Area, Section 401 Water Quality Certificate (Tidal), Structures, Dredging, and Fill (with Tidal Wetlands, 401 Water Quality Certification), Dam Safety Maintenance, Repair, and Alteration non-filing categories, Dam Safety Repair and Alteration: Filing Only Categories, Dam Safety Repair and Alteration: Filing with Approval, Notice of a High Hazard Dam or a Significant Hazard Dam, Flood Management Transmittal Form for DAS MOU, General Permit for Water Resources Construction Activities (on State lands), Inland Wetlands and Watercourses (with 401 Water Quality Certification and Section 404), Pre-Construction Notification USACE General Permit (Section 404), Section 401 Water Quality Certificate (non-tidal), Section 401 Water Quality Certification - FERC Hydropower Projects, Emergency or Temporary Authorization to Discharge to Groundwater to Remediate Pollution, In Situ Groundwater Remediation: Enhanced Aerobic Biodegradation, Diversion of Water for Consumptive Use: Authorization Required, Diversion of Water for Consumptive Use: Filing Only Categories, Diversion of Water for Consumptive Use: Non-Filing Categories, Diversion of Water for Consumptive Use: Reauthorization Categories, Outdoor Recreation & Natural Resources Licensing, Purchase or Reprint Your Sportsmen License, Boating, Camping, Fishing, Hunting and more, Wastewater Treatment Facility Operator, Pesticide Applicatorand more, Operation of hazardous waste landfills or incinerators. map10539 Service Requests - Coming Soon. $3,250 for major emitting equipment or $1,750 for less than major emitting equipment (includes $940 application fee). Paper copies of Building Department forms, applications, and useful information packets are located in weatherproof bins adjacent to the pick-up boxes. Building Department | westportma Application Comments from the Police Dept. Comments from DPW Engineering, 3-2-23 Site Plan prepared by Redniss and Mead, 2-21-23 Authorization 2023 Town of Westport, CT. All Rights Reserved. Once in the portal, click the 2nd tab "Building" and search by address. P&Z Staff Comments The current $719 maximum allowable cost calculation per linear foot of house foundation will rise from $719 to $777. #PZ-23-00078 @font-face {font-family:"Cambria Math"; panose-1:2 4 5 3 5 4 6 3 2 4; mso-font-charset:0; mso-generic-font-family:roman; mso-font-pitch:variable; mso-font-signature:-536870145 1107305727 0 0 415 0;}@font-face {font-family:Calibri; panose-1:2 15 5 2 2 2 4 3 2 4; mso-font-charset:0; mso-generic-font-family:swiss; mso-font-pitch:variable; mso-font-signature:-536859905 -1073732485 9 0 511 0;}@font-face {font-family:"Yu Gothic Light"; panose-1:2 11 3 0 0 0 0 0 0 0; mso-font-alt:" Light"; mso-font-charset:128; mso-generic-font-family:swiss; mso-font-pitch:variable; mso-font-signature:-536870145 717749759 22 0 131231 0;}@font-face {font-family:"\@Yu Gothic Light"; mso-font-charset:128; mso-generic-font-family:swiss; mso-font-pitch:variable; mso-font-signature:-536870145 717749759 22 0 131231 0;}p.MsoNormal, li.MsoNormal, div.MsoNormal {mso-style-unhide:no; mso-style-qformat:yes; mso-style-parent:""; margin-top:0in; margin-right:0in; margin-bottom:10.0pt; margin-left:8.65pt; line-height:115%; mso-pagination:widow-orphan; font-size:12.0pt; font-family:"Calibri",sans-serif; mso-ascii-font-family:Calibri; mso-ascii-theme-font:minor-latin; mso-fareast-font-family:"Times New Roman"; mso-hansi-font-family:Calibri; mso-hansi-theme-font:minor-latin; mso-bidi-font-family:"Times New Roman";}span.normaltextrun {mso-style-name:normaltextrun; mso-style-unhide:no;}.MsoChpDefault {mso-style-type:export-only; mso-default-props:yes; font-size:11.0pt; mso-ansi-font-size:11.0pt; mso-bidi-font-size:11.0pt; font-family:"Calibri",sans-serif; mso-ascii-font-family:Calibri; mso-ascii-theme-font:minor-latin; mso-fareast-font-family:Calibri; mso-fareast-theme-font:minor-latin; mso-hansi-font-family:Calibri; mso-hansi-theme-font:minor-latin; mso-bidi-font-family:Arial; mso-bidi-theme-font:minor-bidi;}.MsoPapDefault {mso-style-type:export-only; margin-bottom:8.0pt; line-height:107%;}div.WordSection1 {page:WordSection1;}. Notification Map Engineering Comments 02-02-23 Positive 8-24 Report for Lease of Longshore Inn 12-21-06 No wait. PDF Town of Westport Island Fee Schedule for Building Permits and Prior to that date, records have been imported from legacy systems and display limited information. Building Department | City of Shelton The Building Department is located in the Fire Department main headquarters. Where to Begin|Public Notice Requirements| Common Forms|Public Notices(Issued by DEEP) |Issued Permits | Environmental Justice| Online Services| Siting Council| Video Library. Address 515 Post Road East Westport, CT 06880 Get Directions Phone 203-341-5025 Web http://www.westportct.gov Zoning History, updated 2-16-23 Official, 3-2-23 Traffic Report 02-06-23 The Building Department is responsible for the following tasks: Free viewers are required for some of the attached documents.They can be downloaded by clicking on the icons below. P&Z Pending Applications & Recent Approvals, Share & Bookmark, Press Enter to show all options, press Tab go to next option, Floodplain and Flood Protection Information, Registration Instructions and Terms & Conditions, State & Federal Resources for Business Owners, Subscribe to Westport Emergency, Meetings, and News eNotifications, Get a Birth, Death or Marriage Certificate, Start a Zoning Request or Construction Project, ZBA Pending Applications & Recent Approvals, 2017 Plan of Conservation and Development, ZBA Variances Database Log by Street Address, Existing Survey prepared by Landtech, 11-04-22, Proposed Survey prepared by Landtech, 11-14-22, Aspetuck Health District approval, 02-28-23, Grading & Utility Plan prepared by Redniss & Mead, 01-06-23, Planting Plan prepared by William Kenny Associates, 01-10-23, Site Engineering Report prepared by Redniss & Mead, 01-06-23, Site Plan prepared by Redniss & Mead, 01-06-23, Topography Survey prepared Redniss & Mead, 01-06-23, Construction Management - Logistics Plan 02-13-23, Aspetuck Health District Comments, 01-23-23, Architectural Review Board 1-24-23 draft minutes, Renderings prepared by Meyer Architecture, 01-23, Letter from First Selectwoman dated 2-25-23 with attached proposed Fourth Amendment, Comments from Parks and Rec. Honda scales back service center plan in 2nd bid for approval (, $8,000 total, including $800 initial fee with balance billed annually in $800 increments.